Interconnection Standards

Technical screens have been established for each level, and the Institute of Electrical and Electronics Engineers 1547 technical standard is used for all interconnections. Reasonable time frames …

Eligibility: Commercial, Industrial, Local Government, Nonprofit, Residential… More

Savings Category: Geothermal Electric, Solar Thermal Electric, Solar Photovoltaics, Wind (All), Biomass… More

 

Renewable Energy System Exemption

For eligible facilities less than 5 megawatts (MW) in capacity, all real property used or constructed for the purpose of producing electricity is assessed in the same manner as other real property…

Eligibility: Commercial, Industrial, Residential, Agricultural

Savings Category: Solar Water Heat, Solar Space Heat, Geothermal Electric, Solar Thermal Electric, Solar Thermal Process Heat… More

 

Renewable Energy Facility Sales and Use Tax Reimbursement

To qualify, the project costs associated with a new or expanded facility must exceed $20 million, and the costs associated with equipment upgrades must exceed $2 million. Eligible project costs i…

Eligibility: Commercial, Industrial, Installers/Contractors, Agricultural

Savings Category: Geothermal Electric, Solar Thermal Electric, Solar Photovoltaics, Wind (All), Biomass… More

 

 

Source: U.S. Department of Energy